We designed and remodel your space

For Living Working Relaxing Enjoying

Our pricing is transparent and always helpful when you decide on your future remodeling project.

Our pricing are
  • TRANSPARENT
  • BUDGET FRIENDLY
  • EASY TO READ
  • UP TO THE CODE

Newest pricing promotion

Special Pricing Table BATHROOM REMODELING

Explore our offerings and find the pricing plan that fits your needs. Each option is designed to provide great value and support your goals

BATHROOM-REMODELING

Regular Bathroom STARTS

$28,000
What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Big Regular Bathroom STARTS

$30,000
What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Master Bathroom STARTS

$32,000
What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Big Master Bathroom STARTS

$39,000
What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Bathroom Remodeling Detailed Scope Of Work

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed

  • Manage Job Access by Installing Temporary Doors and Zip Walls

  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard

  • Our team ensures that the site is left spotless each day

  • For the duration of the project, all debris will be removed to the garage and disposed every week

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Wall framing for the Bathroom will be installed by the Building Code

  • All plumbing fixtures and framing same lacation

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

All Insulation for the Bathroom will be installed by the Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

All Plumbing for the Bathroom will be installed by the Building Code

The owner is to provide all plumbing fixtures

Toilet – Same Location

  • Install the toilet drain and install a new flange

  • Install a new supply line and valve if necessary

  • Install toilet

Tub/Shower – Same Location

  • Rough in and supply for new tub/shower

  • Connect to the existing vent

  • Install tub/shower

  • Install the shower/tub valve and faucets

  • Install rough-in waste and supply lines for shower/tub

Vanity Sink – Same Location

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

All Electrical for the Bathroom will be installed by the Building Code

The owner is to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install a new exhaust fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new LED ceiling Recessed Light per print

All HVAC for the Bathroom will be installed by the Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is, and install a new vent cover

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

All Doors for Bathroom

  • Install new interior door per print

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

All Tiles For Bathroom

Owner to provide all Tiles, Grout,

Install cement backer board for all floors and shower walls

  • Bathroom Floor Tiles: up to 50 – 60 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 50 – 80 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Vanity For Bathroom
Owner to provide vanity, countertop
  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting For the Bathroom

  • Apply one full coat of primer to all interior walls, ceilings, and trims

  • Fill and compound all necessary areas and prepare for painting

  • Caulk all trim work

  • Apply two full coats of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Cleanup For the Bathroom

  • Final job site cleanup

  • Removal of all materials and waste.

  • Cleaning service as required, if necessary

 

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job

  • Detailed architectural print and 3d design, including tiles and all fixtures

  • A job folder will be prepared with all relevant plans, details, and specifications

  • Daily job status updates will be provided

  • Scheduled project walk-through meetings will occur

  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts

  • 5 years warranty for construction and installation