We designed and remodel your space
For Living Working Relaxing Enjoying
Our pricing is transparent and always helpful when you decide on your future remodeling project.
Our pricing are
-
TRANSPARENT
-
BUDGET FRIENDLY
-
EASY TO READ
-
UP TO THE CODE
- TRANSPARENT
- BUDGET FRIENDLY
- EASY TO READ
- UP TO THE CODE
Newest pricing promotion
Special Pricing Table BATHROOM REMODELING
Explore our offerings and find the pricing plan that fits your needs. Each option is designed to provide great value and support your goals


Regular Bathroom STARTS
What is included
- Job Site Preparation
- All Demolition
- Wall framing
- Insulation
- Plumbing
- Electrical
- HVAC
- Drywall
- Doors
- Finish Carpentry
- Tiles
- Cabinetry
- Painting
- Cleanup
- Project Management

Big Regular Bathroom STARTS
What is included
- Job Site Preparation
- All Demolition
- Wall framing
- Insulation
- Plumbing
- Electrical
- HVAC
- Drywall
- Doors
- Finish Carpentry
- Tiles
- Cabinetry
- Painting
- Cleanup
- Project Management

Master Bathroom STARTS
What is included
- Job Site Preparation
- All Demolition
- Wall framing
- Insulation
- Plumbing
- Electrical
- HVAC
- Drywall
- Doors
- Finish Carpentry
- Tiles
- Cabinetry
- Painting
- Cleanup
- Project Management

Big Master Bathroom STARTS
What is included
- Job Site Preparation
- All Demolition
- Wall framing
- Insulation
- Plumbing
- Electrical
- HVAC
- Drywall
- Doors
- Finish Carpentry
- Tiles
- Cabinetry
- Painting
- Cleanup
- Project Management
Bathroom Remodeling Detailed Scope Of Work
- Sitework
- Demolition
- Framing
- Insulation
- Plumbing
- Electrical
- Hvac
Job Site Preparation
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
Manage Job Access by Installing Temporary Doors and Zip Walls
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
Our team ensures that the site is left spotless each day
For the duration of the project, all debris will be removed to the garage and disposed every week
All Demolition for Bathroom
Disconnect all bath fixtures and electrical components as needed
As needed, remove cabinetry and other finish
Complete bathroom demolition down to the studs
Remove any fixtures / appliances
Remove all walls and ceiling down to the studs
Remove all nails and clean joist
Removing the Finish Flooring
Sweep / vacuum
Remove all nails and clean joist
Remove the subfloor as necessary to install new plumbing
Wall framing for the Bathroom will be installed by the Building Code
All plumbing fixtures and framing same lacation
Remove and replace sub floor as required for new plumbing
Framing walls for shower / tub, frame a in wall niche per print
Install all blocking and nailers as required by code
All Insulation for the Bathroom will be installed by the Building Code
Walls – Install R-15/19 Paper face Insulation
Ceiling – Install R-15/32 Paper face Insulation
Insulation, air/fire stopping for new construction
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
All Plumbing for the Bathroom will be installed by the Building Code
The owner is to provide all plumbing fixtures
Toilet – Same Location
Install the toilet drain and install a new flange
Install a new supply line and valve if necessary
Install toilet
Tub/Shower – Same Location
Rough in and supply for new tub/shower
Connect to the existing vent
Install tub/shower
Install the shower/tub valve and faucets
Install rough-in waste and supply lines for shower/tub
Vanity Sink – Same Location
Install rough in waste and supply lines for vanity sink
Connect into existing vent
Install new sink and faucet
All Electrical for the Bathroom will be installed by the Building Code
The owner is to provide all electrical fixtures
Furnish all electrical components necessary for the project
Disconnect any necessary wiring and reconfigure as needed
Supply and install a new exhaust fan/light combo
Install wire for vanity light and mirror
Install new GFCI
Supply and install new LED ceiling Recessed Light per print
All HVAC for the Bathroom will be installed by the Building Code
Vent bathroom fan to exterior, using existing or new solid vent
Existing heating vent to remain as is, and install a new vent cover
- Drywall
- Doors
- Carpentry
- Tiles
- Cabinetry
- Painting
- Cleanup
- Managements
All Drywall for Bathroom
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
Matching existing finishes and patching up as necessary
Tape and metal/paper corners for all joints
Apply two coat plaster veneer finish
Sanding all drywall area and prepare for primer
All Doors for Bathroom
- Install new interior door per print
All Finish Carpentry for Bathroom
Install Door and Window casings
Install all paint grade door and window casings to match existing
Install floor baseboards
Install all baseboard trim
Paint grade baseboard
Matching the existing baseboard as needed
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backer board for all floors and shower walls
Bathroom Floor Tiles: up to 50 – 60 sf
Install all bathroom floor tiles as selected by owner
Use Latex modified thinnest mortar
Grout all new floor tiles
Shower / tub Surround Tiles: up to 50 – 80 sf
Install all shower/tub tiles
Grout all new shower/tub tiles
Caulk junctions at corners shower and tub
Grout all new tile
Vanity For Bathroom
Owner to provide vanity, countertop
Install new vanity cabinet as selected by owner
Install new vanity mirror as selected by owner
Painting For the Bathroom
Apply one full coat of primer to all interior walls, ceilings, and trims
Fill and compound all necessary areas and prepare for painting
Caulk all trim work
Apply two full coats of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Cleanup For the Bathroom
Final job site cleanup
Removal of all materials and waste.
Cleaning service as required, if necessary
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
A dedicated project manager will be assigned to oversee the job
Detailed architectural print and 3d design, including tiles and all fixtures
A job folder will be prepared with all relevant plans, details, and specifications
Daily job status updates will be provided
Scheduled project walk-through meetings will occur
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
5 years warranty for construction and installation